Drilling

Our consultants have experience in:

  • Drilling from 2000′ to 26,000′
  • Onshore/Offshore
  • Domestic and Foreign Sites
  • Coil tubing drilling
  • Drilling with Casing
  • Onshore pad drilling (wells 8′ apart)
  • Drilling wells to intersect old well bores
  • Directional and horizontal drilling
  • Underbalanced drilling
  • Re-entering old abandoned wellbores
  • Blind side track drilling

Comments are closed.